Hi Experts
Is it possible to create a UI task for an existing job. This is required so that the user does not have to login to the MC to run the job.
Is this possible. Do i need to export the job and import into the UI task as an action task > import job?
When I tried this I got the below error. Pretty sure I'm doing something terribly wrong here
Please could you let me know if this is possible and how to achieve the same.
Thanks
Ran
SAP IDM 7.2 SP9
DB - SQL